This project involved replacing
the copper drainway and instal-
ling ice guard under the slate.
Scaffolding was erected for the
project.
The old copper drainway and
slate were removed.
The wood deck and drainway were covered with ice guard.
To protect the new drainway
liner it was put in a trailer and
taken to the job.
The new drainway liner was
installed.
The old drainway liner was
taken back to the shop where
a new liner was fabricated.
The new drainway and ice
guard system were soon put
to the test.
After the drainway was com-
pleted the old slate were
installed.
The copper drainway at a municipal building was leaking into the
mayor's office. A new copper drainway was fabricated in sections
at the shop and hand soldered on site.