Projects-
City wanted to brighten dark
interior with skylights.
Copper drainways were restored,
new slate and snowrails installed.

New copper drainway liner, ice
guard, slate reinstalled.
Old cement tile were becoming
dangerous, difficult set-up,
installed shingles.
Additional roof insulation was
installed for tenant's comfort.
Aluminum gutters had to be re-
placed after heavy snow  slides.
Old problems are solved with
a new roof.
A collapsed classroom roof is
rebuilt.
The homeowner wanted to match
the original green stained wood
shingles as closely as possible.

New skylights get installed
Click On Picture To Enter
Church's large copper drainways are restored
Click On Picture To Enter
City Hall needs a new copper drainway
Click On Picture To Enter
Old concrete tiles are replaced
Click On Picture To Enter
Restoring roof to appear as original
Click On Picture To Enter
Large roof gets insulation
Click On Picture To Enter
Special gutters for heavy snow loads
Click On Picture To Enter
Convent roof is replaced
Click On Picture To Enter
A collapsed roof is repaired
Click On Picture To Enter
READER ROOFING
Est. 1920
Est. 1920